Saudi Arabia Third Store Construction Diary : Mission Accomplished! Over a Month of Overcoming Challenges, the Trendy Play Hub Shines Bright! - Gimnasio deportivo moderno, Parque inferior, Parque de trampolín, Parque de juegos de aventura, Proveedor del fabricante de parques de escalada

Saudi Arabia Third Store Construction Diary : Mission Accomplished! Over a Month of Overcoming Challenges, the Trendy Play Hub Shines Bright!

A victorious conclusion! July 10th, a day to remember! After over a month of meticulous construction, our third trendy play hub in Saudi Arabia has officially opened its doors! 🎉

Seeing the venue filled with children playing freely on the equipment and hearing their happy laughter echo through the space, at that moment, recalling all the challenges we faced over the past month and our team’s brilliant responses, the sense of accomplishment simply overflowed!


01 Challenges & Ingenuity: Turning the Impossible into Possible


The overseas projects are truly out of the ordinary; over this past month, we’ve faced wave after wave of challenges. But it was precisely these challenges that allowed our team to demonstrate extraordinary professionalism and adaptability!

Challenge 01: The Test of Material Supply

Early in the project, we encountered a missing section of the slide rail. However, our team reacted quickly, immediately communicating the specific dimensions with Engineer Chen and contacting local suppliers to procure materials for in-house processing – a perfect solution! Later, a similar situation arose with the volcano climbing materials, and we actively communicated with suppliers to ensure every item was delivered.

Challenge 02: Breakthroughs in Technical Difficulties

Problems with the track flange connection of the light cycle motorbikes, misalignment of the bottom support for the steel frame track, damaged winch motor casingeach technical issue was a test of our professional capabilities. The most fulfilling achievement was solving the seat pin issue for theWind Fire Wheelride, a problem that had everyone scratching their heads. But our technical team refused to give up, conducting repeated research and finally finding a perfect solution. Now the equipment runs incredibly smoothly!

Ingenuity in On-Site Construction

Variations during the construction process were commonplace. When the staircase needed to be moved from the right side to the left due to a wooden house obstruction, we immediately adjusted without hesitation; when the fence corner dimensions were incorrect, our skilled technicians performed on-site cutting and welding; regarding the durability of cable ties for pipes in outdoor environments, we anticipated the issue and provided maintenance advice in advance.

The Pursuit of Excellence

What was most touching was the team’s dedication to detail. When the client requested lighting effects on all four sides of the expansion area, we immediately adjusted the plan; when the door heights needed optimization, we re-fabricated all entrance doors, uniformly adjusting them to the most suitable size; for the centrifuge’s rotation speed debugging, we repeatedly tested to ensure the optimal experience. Even for the selection of LED strips, we considered multiple factors like voltage matching, safety, and aesthetics, providing the client with the most professional advice.


02 Grand Opening: All Efforts Paid Off

On July 11th, the free experience day, the overwhelming popularity at the venue fully validated the value of all our efforts over the past month! During slide testing, we used children of different weights (from 13kg to 32.5kg) for actual testing, ensuring children of every age group could have the best experience; the Diamond Centrifuge, after repeated debugging, created that wonderful centrifugal force experience that thrilled every child; the smooth operation of the Light Cycle motorbikes on the elevated track drew gasps of amazement


The opening day was incredibly popular!


03 Team Spirit: A Perfect Example of Cross-National Collaboration

The success of this project is inseparable from the seamless cooperation of the entire team. Engineer Yu, on-site, led by example, personally solving every problem; our domestic technical team provided 24/7 online support; and the client gave us their full trust and cooperation, allowing us to fully exercise our professional capabilities. Although various challenges were encountered during the process, it was precisely these challenges that made our team more united, our technology more refined, and our service more attentive. The Saudi client spoke highly of our team.


The fourth store in Saudi Arabia is already gearing up! Seeing children happily playing on the equipment we meticulously built and witnessing the satisfied smiles of parents, we know that overcoming every challenge and perfecting every detail was worth it! The project for the fourth store in Saudi Arabia is already underway! With the invaluable experience gained from the first three stores, we are confident we can do even better, faster, and more spectacularly! Mizone’s overseas journey continues to write new chapters of glory! 🚀

If you also have a venue and want to open a trendy sports complex, feel free to click [Read Original] to add me. I’ll provide you with detailed information and a personalized plan!

 